1、
石油工程作业英语900句
The rigging up is finished.
2、 现在开始检查和调试钻机。
Let’s start to check and test the rig.
3、 所有操作都应该按正规程序进行。
All the operation should be done per normal procedures.
4、 不戴安全帽不许上钻台工作。
It is not allowed to work on the rig floor without helmet on.
5、 上井架工作必须系好安全带。
The safety belt should be fastened when working on the derrick.
6、 上班前不许喝酒。
Wine drinking is not allowed before going to work.
7、 大约下午1点能够开钻。
Spud in will begin at one o’clock in the afternoon.
8、 一开采纳转速160,钻压2000磅
For the first spud in,penetration rate is160 and weight on the bit is two thousand pounds.
9、 开双泵,泵冲100,泵压6兆帕
Use both pumps with 100strokes per minute and pressure of 6 Mpa.
10、 打完单根划眼一次,直到打完一开。
Do a dummy trip after single joint drilling until the first spud in finished.
11、 循环一个半小时再起钻。
Circulate for one and half hours before pulling out.
12、 如有专门情形,赶忙报告。
Report at once if any unusual case occurred.
13、 下钻要操纵下放速度。
Control the running speed when going in the hole.
14、 当心顿钻伤人。
Be careful not to make free fall and hurt anyone.
15、 如遇阻,不许硬压。
Don’t force to run in with too more
16、 观看振动筛有无跑泥浆现象。
See if any mud overflow on the screen.
17、 现在需要赶忙更换筛布。
We need to change the screen at once.
18、 认真做好记录
Record it carefully.
19、 不许做假资料
Don’t make false record.
20、 每钻进100米测斜一次
Do a deviation survey every 100 metre interval.
21、 勤活动钻具
Move the drill string frequently.
22、 将测斜结果及时汇报监督
The result of deviation survey has to be informed to supervisor in time .
23、 扭矩不要过大。
Don’t apply excessive torque
24、 不许强提。
No forced pulling out is allowed.
25、 差不多提放多次,未见成效。
The string has been moved up and down several times, but it doesn’t work .
26、 接方钻杆,倒划眼
Connect kelly and do a backreaming.
27、 在钻杆上做卡点记号。
Make a mark for sticking point on the drill pipe.
28、 当心扭断钻具。
Be careful not to twist off the drill string.
29、 未得到监督的许可,不许乱来
Don’t act at your disposal without supervisor’s consent.
30、 下钻时,不许用转盘上扣。
Don’t make up by rotary table while running in .
31、 用双钳紧扣。
Make up and tighten by both tongs.
32、 对所有防范措施作一次检查。
Check all the precaution measures.
33、 作一次防喷演习。
Do a blow out prevention exercise.
34、 按深度,现在快接近油气层了。
It approaches the pay zone based on depth .
35、 作好正常排量1/3的泵压记录。
Make a record of pump pressure at one third of normal rate.
36、 作好压井预备。
Get ready to kill the well.
37、 该更换刹车片了.
The brake blocks need to changed.
38、 每起钻20柱,要核对泥浆的升降情形。
Check the fluctuation of mud level whenever 20 strings pulled out.
39、 如此下去,要扣你们的日费.
Your day rate will be deducted in such a case.
40、 日保养时刻不得超过15分钟。
The daily maintenance will be done for less than 15 minutes.
41、 现在需要加大钻压.
The weight on the bit has to be increased now.
42、 井下显现复杂情形,不要离开钻台。
There is some trouble in the borehole,don’t leave the rig floor.
43、 我们在等措施和检修设备。
We are waiting for the completion of service and equipment maintenance.
44、 将二开钻具下到水泥塞处。
Run the string for the second spud in to the cement plug.
45、 井下差不多畅通无阻。
The borehole is in real good shape.
46、 请帮我将泥浆罐清洗洁净。
Please help me to clean the mud tank .
47、 罐内放满水后,配泥浆。
Fill up the tank with water , then prepare the mud.
48、 安装井口时,上紧各螺丝。
Tighten all the screws when installing the wellhead.
49、 看看井口有没有泄漏现象。
See there is any leakage on the wellhead .
50、 把这些工具整理好。
Put these tools in good order .
51、 不要把这些工具放在这。
Don’t put these tools here .
52、 这台机器运转时有杂音。
There is a noise while this machine is running .
53、 应当停车,检查缘故。
We have to shut down it to check the cause .
54、 泵压忽高忽低,该如何办?
The pump pressure is fluctuating , what can I do ?
55、 必须赶忙起钻,弄清晰如何回事。
The string has to be pull out at once to see what’s wrong .
56、 现在下钻。
Run the string in the hole now.
57、 开始循环.
Start the circulation .
58、 接单根。
Make a connection .
59、 开始卸扣。
Start to break out the pipe.
60、 先接好引鞋和套管鞋。
First , connect the guide shoe and the casing shoe.
61、 所有接头都要涂上螺纹脂。
All the joins should be coated with thread compound.
62、 每隔一根套管下一个扶正器。
63、 除司钻外,其他人不许上钻台。
、 固井水罐负责打水的人不许脱岗。
65、 卸水泥头及管汇后,将井口拉正。
66、 关闭全封闸板。
67、 要求5分钟不卸压。
68、 打开半封,试各压井阀。
69、 所有试压都合格。
70、 将方钻杆提出转盘面。